hmm..i enter in exactly (DateDiff("d",Field1,Now())/Field2) in the entry field in design view? I tried that..and I tried the same thing with an equals sign infront. both are displayed as what i typed..it doesnt calculate the function. Do I have to enter in the today's date in Now()? Tried that as well..Ugh I have no clue how to do this.